Amity International School
Amity International School

International School inclusive of Class rooms, Laboratories, Swimming Pool, and Soccer Stadium & External Areas. Client: Amity International School

 

Client: Ritnand Balved Education Foundation

Consultant: Dewan Consultant

Main Contractor: M/s Shapoorji & Palloonji

MEP Contractor: M/s BEMCO.

Scope of Works:

MEP Services inclusive of:

  • HVAC – 540 TR CHW System Inclusive of Air Cooled Chillers 2Nos., Chilled Water Pumps, FAHUs, AHUs, Chilled Water Piping Network, GI Ducting & Building Management System (BMS).
  • Electrical - LV (2.1 MVA) including 1500kVA Transformers 2nos., 2 nos MDBs SMDBs, DBs,, & ELVSystems( CCTV, Access control, Security System etc.)
  • Fire Alarm, Fire Fighting
  • Plumbing (Drainage, Water supply system Including Sanitary wares, Filtration System, Transfer/ Booster Pumps/ Sumps Pumps etc.)
Operation Management Centre Building, EGA Taweelah
Operation Management Centre Building, EGA Taweelah

Operation Control Building for Shaheen Industrial Area (Alumina Refinery)

 

Client: EMAL/ Mubadala

Consultant: BPJV (Bechtel Petrofac Joint Venture)

Main Contractor: NASS Contracting

MEP Contractor: M/s BEMCO.

Scope of Works:

MEP Services inclusive of:

  • HVAC - CHW System of 352TR Inclusive of 3 Nos. Chillers, FAHUs, AHUs, FCUs, GI Ducting, Chilled Water Network, Chilled Water Pumps, Heat and Dust Extract Systems etc.
  • Electrical - MDB - 1 Nos.(3.7MVA), SMDBs, DBs, Diesel Generator 300kVA & ELV Services Inclusive of CCTV System, Central Battery System, Access Control System , Telecom & Data System etc..)
  • Fire Alarm System.
  • Plumbing Works (Drainage & Water Supply Network) Inclusive of Filtration System, Transfer/ Booster/ Sump Pumps.
Cleveland Clinic Abu Dhabi
Cleveland Clinic Abu Dhabi

Multispecialty Hospital and Clinic

 

 

Client: Cleveland Clinic Abu Dhabi

 

Project Manager / Main Contractor: Parsons

MEP Contractor: M/s. BEMCO

Scope of Works:

MEP Services inclusive of:

  • Rectification & Modification of Around 5000 MSFDs. HVAC Remedial Works
Al Ghadeer Phase-II Villas Development (Plot:N1-R1) - Infrastructure Package
Al Ghadeer Phase-II Villas Development (Plot:N1-R1) - Infrastructure Package

Client: M/s Al Dar

Consultant: M/s Arcadis

Main Contractor: M/s Al Rakha General Contracting & Transport

MEP Contractor: M/s BEMCO

Scope of Works:

  • Supply and Installation of 6 Nos. of Plot N1-R1 Substations including 6 Nos. of HV Panels, 12 Nos. of Transformers, DMS Integration, 6 Nos. of 48V DC Battery Charger.
  • Underground 11kV Cable Network for Plot Substations from Primary Substation of 8200 Mtrs (approx.).
  • Underground LV Cable Network from Plot Substations to Villas of 35000 Mtrs (approx.).
  • Underground LV Cable Network with UPVC Ducts for Street lighting of 5500 Mtrs.
  • Underground GRP & UPVC Pipes Network for Sewerage system of 8500 Mtrs.
  • Underground GRP & UPVC Pipes Network for Storm water System & Sub Soil Drainage of 6850 Mtrs.
  • Underground HDPE Pipes Network for Potable water system of 8500 Mtrs
  • Underground HDPE Pipes Network for Fire Fighting system for 38 Nos. of fire Hydrant of 8500 Mtrs
  • Underground HDPE Pipes Network for Irrigation System of 7500 Mtrs.