Al Ghadeer Phase-II Villas Development (Plot:N1-R1) - Infrastructure Package
Client: M/s Al Dar
Consultant: M/s Arcadis
Main Contractor: M/s Al Rakha General Contracting & Transport
MEP Contractor: M/s BEMCO
Scope of Works:
- Supply and Installation of 6 Nos. of Plot N1-R1 Substations including 6 Nos. of HV Panels, 12 Nos. of Transformers, DMS Integration, 6 Nos. of 48V DC Battery Charger.
- Underground 11kV Cable Network for Plot Substations from Primary Substation of 8200 Mtrs (approx.).
- Underground LV Cable Network from Plot Substations to Villas of 35000 Mtrs (approx.).
- Underground LV Cable Network with UPVC Ducts for Street lighting of 5500 Mtrs.
- Underground GRP & UPVC Pipes Network for Sewerage system of 8500 Mtrs.
- Underground GRP & UPVC Pipes Network for Storm water System & Sub Soil Drainage of 6850 Mtrs.
- Underground HDPE Pipes Network for Potable water system of 8500 Mtrs
- Underground HDPE Pipes Network for Fire Fighting system for 38 Nos. of fire Hydrant of 8500 Mtrs
- Underground HDPE Pipes Network for Irrigation System of 7500 Mtrs.