COMPLETED INFRA PROJECTS

Al Ghadeer Phase-II Villas Development (Plot:N1-R1) - Infrastructure Package
Al Ghadeer Phase-II Villas Development (Plot:N1-R1) - Infrastructure Package

Client: M/s Al Dar

Consultant: M/s Arcadis

Main Contractor: M/s Al Rakha General Contracting & Transport

MEP Contractor: M/s BEMCO

Scope of Works:

  • Supply and Installation of 6 Nos. of Plot N1-R1 Substations including 6 Nos. of HV Panels, 12 Nos. of Transformers, DMS Integration, 6 Nos. of 48V DC Battery Charger.
  • Underground 11kV Cable Network for Plot Substations from Primary Substation of 8200 Mtrs (approx.).
  • Underground LV Cable Network from Plot Substations to Villas of 35000 Mtrs (approx.).
  • Underground LV Cable Network with UPVC Ducts for Street lighting of 5500 Mtrs.
  • Underground GRP & UPVC Pipes Network for Sewerage system of 8500 Mtrs.
  • Underground GRP & UPVC Pipes Network for Storm water System & Sub Soil Drainage of 6850 Mtrs.
  • Underground HDPE Pipes Network for Potable water system of 8500 Mtrs
  • Underground HDPE Pipes Network for Fire Fighting system for 38 Nos. of fire Hydrant of 8500 Mtrs
  • Underground HDPE Pipes Network for Irrigation System of 7500 Mtrs.
CB2007 Concrete Works, ATA Power Island, Abu Dhabi
CB2007 Concrete Works, ATA Power Island, Abu Dhabi

High Rise Tower Inclusive of 3 Basement Parkings + 35 Floors Hotel / Service Apartments Kitchens, Restaurants & Pool Deck

Client: H.H. Sh. Ahmed Bin Saif Al Nahyan.

Consultant: Fraser Nag & Partners & Proleed Engineering

Main Contractor: M/s CIVILCO

MEP Contractor: M/s BEMCO

Project Manager: ADCE

Scope of Works:

MEP Services inclusive of:

  • HVAC - 1300TR CHW System By District Cooling Inclusive of Heat Exchangers, Chilled Water Pumps, FAHUs, AHUs, Chilled Water Piping Network, GI Ducting & Building Management System (BMS).
  • Electrical - LV (5.6MVA) including 1500kVA Transformers 2nos. 1000kVA Transformers 3nos., 5 nos. of MDBs, SMDBs, DBs, Diesel Generator of 800 kVA & ELV Systems ( CCTV, Access control, Security System, Door Lock system & Signage).
  • Fire Fighting & Fire Alarm Systems.
  • Plumbing (Drainage, Water supply system Including Sanitary wares, Filtration System, Calorifiers, Transfer /Booster Pumps/ Sumps Pumps etc.)
Marina Mall Extension Phase-2 Diversion And Access Mitigation
Marina Mall Extension Phase-2 Diversion And Access Mitigation

Client: National Investment Corporation

Consultant: Khatib & Alami

Main Contractor: M/s Nurol Contracting LLC

MEP Contractor: M/s. BEMCO

Scope of Works:

Infrastructure works:

  • Diversion of Underground 11kV Cables for 6 Marina Mall Substations to Primary Substation of 8200 Mtrs.inclusive of 24nos, Cable Joints and Termination to the Primary and Marina Mall Substations..
  • Diversion of Underground and Aboveground Tabreed 450mm Dia Chilled water District Cooling Network of 350 Mtrs Including Hot-Tapping, Insulation and Testing and Commissioning.
  • Upgradation of DMS System to the Existing 11kV Panels in Marina Mall Substations.
  • Diversion of Earthing system in North and South side of Marina Mall Including 52nos. of Earth Pits.
  • Diversion of Underground Storm water Network, Potable Water Network, Sewerage Network of 1250Mtrs, 1460Mtrs & 1370 Mtrs respectively

COMPLETED MEP PROJECTS

Amity International School
Amity International School

International School inclusive of Class rooms, Laboratories, Swimming Pool, and Soccer Stadium & External Areas. Client: Amity International School

 

Client: Ritnand Balved Education Foundation

Consultant: Dewan Consultant

Main Contractor: M/s Shapoorji & Palloonji

MEP Contractor: M/s BEMCO.

Scope of Works:

MEP Services inclusive of:

  • HVAC – 540 TR CHW System Inclusive of Air Cooled Chillers 2Nos., Chilled Water Pumps, FAHUs, AHUs, Chilled Water Piping Network, GI Ducting & Building Management System (BMS).
  • Electrical - LV (2.1 MVA) including 1500kVA Transformers 2nos., 2 nos MDBs SMDBs, DBs,, & ELVSystems( CCTV, Access control, Security System etc.)
  • Fire Alarm, Fire Fighting
  • Plumbing (Drainage, Water supply system Including Sanitary wares, Filtration System, Transfer/ Booster Pumps/ Sumps Pumps etc.)
Operation Management Centre Building, EGA Taweelah
Operation Management Centre Building, EGA Taweelah

Operation Control Building for Shaheen Industrial Area (Alumina Refinery)

 

Client: EMAL/ Mubadala

Consultant: BPJV (Bechtel Petrofac Joint Venture)

Main Contractor: NASS Contracting

MEP Contractor: M/s BEMCO.

Scope of Works:

MEP Services inclusive of:

  • HVAC - CHW System of 352TR Inclusive of 3 Nos. Chillers, FAHUs, AHUs, FCUs, GI Ducting, Chilled Water Network, Chilled Water Pumps, Heat and Dust Extract Systems etc.
  • Electrical - MDB - 1 Nos.(3.7MVA), SMDBs, DBs, Diesel Generator 300kVA & ELV Services Inclusive of CCTV System, Central Battery System, Access Control System , Telecom & Data System etc..)
  • Fire Alarm System.
  • Plumbing Works (Drainage & Water Supply Network) Inclusive of Filtration System, Transfer/ Booster/ Sump Pumps.
Cleveland Clinic Abu Dhabi
Cleveland Clinic Abu Dhabi

Multispecialty Hospital and Clinic

 

 

Client: Cleveland Clinic Abu Dhabi

 

Project Manager / Main Contractor: Parsons

MEP Contractor: M/s. BEMCO

Scope of Works:

MEP Services inclusive of:

  • Rectification & Modification of Around 5000 MSFDs. HVAC Remedial Works
Pullman Hotel 5*, JLT Dubai
Pullman Hotel 5*, JLT Dubai

High Rise Tower Inclusive of 3 Basement Parkings + 35 Floors Hotel / Service Apartments Kitchens, Restaurants & Pool Deck

Client: H.H. Sh. Ahmed Bin Saif Al Nahyan.

Consultant: Fraser Nag & Partners & Proleed Engineering

Main Contractor: M/s CIVILCO

MEP Contractor: M/s BEMCO

Project Manager: ADCE

Scope of Works:

MEP Services inclusive of:

  • HVAC - 1300TR CHW System By District Cooling Inclusive of Heat Exchangers, Chilled Water Pumps, FAHUs, AHUs, Chilled Water Piping Network, GI Ducting & Building Management System (BMS).
  • Electrical - LV (5.6MVA) including 1500kVA Transformers 2nos. 1000kVA Transformers 3nos., 5 nos. of MDBs, SMDBs, DBs, Diesel Generator of 800 kVA & ELV Systems ( CCTV, Access control, Security System, Door Lock system & Signage).
  • Fire Fighting & Fire Alarm Systems.
  • Plumbing (Drainage, Water supply system Including Sanitary wares, Filtration System, Calorifiers, Transfer /Booster Pumps/ Sumps Pumps etc.)

 

Residential Building C-104 & C-105- In Rawdhat, Abu Dhabi
Residential Building C-104 & C-105- In Rawdhat, Abu Dhabi

Residential Towers - C74, C75 & C76, consisting of 2 Basements & 8 Floors each Tower.

Client: First Gulf Properties

Consultant: EWAN Engineering

Main Contractor: M/s. CHAPO UAE

MEP Contractor: M/s BEMCO

Scope of Works:

MEP Services:

  • Fire Fighting
  • Plumbing (Drainage, Water supply system Including Sanitary wares, Filtration System, Transfer /Booster Pumps/ Sumps Pumps etc.)

 

Construction And Completion Of Housing Blocks (A & B) Staff Accommodation Plot No. (365-587) €? Al Quoz, Dubai
Construction And Completion Of Housing Blocks (A & B) Staff Accommodation Plot No. (365-587) €? Al Quoz, Dubai

Fairmont Dubai Accomodation

Consultant: NEXT Engineering Consultants

Main Contractor: M/s. NUROL LLC

MEP Contractor: M/s BEMCO

Scope of Works:

MEP Services:

  • HVAC – Ductable Split AC of 600 TR & GI Ducting.
  • Electrical Systems - LV (1 MVA of Load) including 1 no MDB, SMDBs, DBs,, Light Fixtures, Wiring Accessories Emergency Lighting, & ELV Systems( CCTV, Access control, Security System etc.)
  • Fire Alarm & Fire Fighting.
  • Plumbing (Drainage, Water supply system Including Sanitary wares, Filtration System, Transfer /Booster Pumps/ Sumps Pumps etc.)

 

Residential Building C74,C75,C76 - In Rawdhat, Abu Dhabi
Residential Building C74,C75,C76 - In Rawdhat, Abu Dhabi

Residential Towers - C74, C75 & C76, consisting of 2 Basements & 8 Floors each Tower.

Client: First Gulf Properties

Consultant: EWAN Engineering

Main Contractor: M/s. CHAPO UAE

MEP Contractor: M/s BEMCO

Scope of Works:

MEP Services:

  • Fire Fighting
  • Plumbing (Drainage, Water supply system Including Sanitary wares, Filtration System, Transfer /Booster Pumps/ Sumps Pumps etc.)
Labour Accomodation At Sweihan Abu Dhabi
Labour Accomodation At Sweihan Abu Dhabi

Labour & Staff Accomodation of Capacity 3000 Labours.

Client: M/s. NUROL LLC

MEP Contractor: M/s BEMCO

Scope of Works:

MEP Services:

  • HVAC, Ductable Split System of 500TR & GI Ducting.
  • Electrical, MDB- 1 Nos., SMDBs, DBs, Inclusive of Light Fixtures, Wiring Accessories & Emergency Lighting.
  • Fire Alarm & Fire Fighting System.
  • Plumbing Works (Drainage & Water Supply Network) Inclusive of Filtration System, Transfer/ Booster/ Sump Pumps, Heat Pumps.
Glenbeigh HQ At DWC Dubai
Glenbeigh HQ At DWC Dubai

2 Warehouses + Office Building in an Area of 3600 sq mtrs.

Client: Glenbeigh Records Management.

Consultant: SEMAC Consultants

Main Contractor: M/s. Glenbeigh Design & Build

MEP Contractor: M/s BEMCO

Scope of Works:

MEP Services:

  • HVAC, Ductable DX System of 80TR. inclusive of Smoke & Heat Extract System.
  • Electrical, Transformer 1500kVA- 1 Nos., MDB - 1 Nos, SMDBs, DBs, Inclusive of Light Fixtures, Wiring Accessories & Emergency Lighting.
  • Fire Alarm & Fire Fighting System.
  • Plumbing Works (Drainage & Water Supply Network) Inclusive of Filtration System, Transfer/ Booster/ Sump Pumps, Heat Pumps.
Abu Dhabi Sports Club For Special Needs
Abu Dhabi Sports Club For Special Needs

Client: Musanada

Design Consultant: EHALF Consulting Engineers

Supervision Consultant:UPA

Main Contractor: M/s. Alghanim International General Contracting

MEP Contractor: M/s BEMCO

Scope of Works:

MEP Services:

  • HVAC - CHW System of 540TR Inclusive of 2 Nos. Chillers, FAHUs, AHUs, De- humidifiers, FCUs, GI Ducting, Chilled Water Network, Chilled Water Pumps etc..
  • Electrical - HV Panels, Transformers 1500kVA- 3 Nos., MDBs- 3 Nos.(4.7MVA),SMDBs, DBs, Diesel Generator 320kVA & ELV Services Inclusive of CCTV System, CentralBattery System, Access Control System etc..).
  • Fire Alarm System.
  • 4. Plumbing Works (Drainage & Water Supply Network) Inclusive of Filtration System, Transfer/ Booster/ Sump Pumps, Heat Pumps.

Infrastructure Services:

  • Underground GRP & UPVC Pipes Network for Sewerage system and Storm Water Network of 450 Mtrs & 325 Mtrs. respectively.
  • Underground HDPE Pipes Network for Potable water system , Fire Fighting System & Irrigation System of 275 Mtrs, 350 Mtrs. & 285 Mtrs. respectively.
  • Underground Cable Network for HV/MV Cable Network, Street Lights including Cable Ducts of 3500 Mtrs.